Just a short post before Christmas
After the hull was pulled from the mold and sent off to the fitting line, they started in on the deck. First up was spraying the mold with gelcoat.
The next photo shows the foam installed. You can also see the outer layer of fiberglass around the edges.
Once the inner fiberglass is installed it’s time for the vacuum bag and the infusion process.